住建局2024年上半年工作总结及下半年工作思路

VIP专免
2024-06-23 999+ 19.3KB 20 页 海报
侵权投诉
NoSuchBucket The specified bucket does not exist. 6847AEF88BC8013835039FDF tizhiren.oss-cn-shanghai.aliyuncs.com tizhiren 0015-00000101 https://api.aliyun.com/troubleshoot?q=0015-00000101
NoSuchBucket The specified bucket does not exist. 6847AEF8897E3133397C4DDF tizhiren.oss-cn-shanghai.aliyuncs.com tizhiren 0015-00000101 https://api.aliyun.com/troubleshoot?q=0015-00000101
NoSuchBucket The specified bucket does not exist. 6847AEF80D39F733337CE946 tizhiren.oss-cn-shanghai.aliyuncs.com tizhiren 0015-00000101 https://api.aliyun.com/troubleshoot?q=0015-00000101
NoSuchBucket The specified bucket does not exist. 6847AEF8897E313530214EDF tizhiren.oss-cn-shanghai.aliyuncs.com tizhiren 0015-00000101 https://api.aliyun.com/troubleshoot?q=0015-00000101
NoSuchBucket The specified bucket does not exist. 6847AEF82E2F7835356F361E tizhiren.oss-cn-shanghai.aliyuncs.com tizhiren 0015-00000101 https://api.aliyun.com/troubleshoot?q=0015-00000101
NoSuchBucket The specified bucket does not exist. 6847AEF81171CD36325DF2F9 tizhiren.oss-cn-shanghai.aliyuncs.com tizhiren 0015-00000101 https://api.aliyun.com/troubleshoot?q=0015-00000101

标签: #工作总结

摘要:

住建局2024年上半年工作总结及下半年工作思路今年上半年以来,我局在区委、区政府的正确领导下,以党的十九大精神为指导,全面践行区委第十届三次全会精神,紧紧围绕区委“高水平全面建设国内一流现代化中心区、打造世界名城首善之区”目标,以争当新时代一流铁军排头兵的决心和志气全力推动各项工作。一、上半年主要工作紧扣目标,序时推动市对区考核1.基础设施建设工作。主次干道建设:经与市建委多轮对接,明确考核目标任务,期间主动联系有关建设主体了解道路建设项目实际状况,统筹考虑道路建设进度支配目前主次干路项目15个,其中包括开工6条,续建1条,完工1条干道,前期4条,移交3条。开工、续建和完工项目均有序推动,前期...

展开>> 收起<<
住建局2024年上半年工作总结及下半年工作思路.docx

共20页,预览6页

还剩页未读, 继续阅读

请登录,再发表你的看法

登录/注册

评论(0)

没有更多评论了哦~
声明:文档来自于公开资料整理和用户上传
/ 20
客服
关注